Make More Money For Your Business...Click Here

TUBULAR SECOND FLOOR I LOW BUDGET SECOND FLOOR I SECOND FLOOR NA GAWA SA TUBULAR AT MARINE PLYWOOD

0 views
0%



Oro, Plata, Mata: https://youtu.be/7ImuK_zaFb8

List of Materials

DESCRIPTION SIZE PCS ITEM COST TOTAL COST
Angle Bar 2×2 6 680 4,080.00
Tubular 2×4 13 870 11,310.00
Tubular 2×2 5 630 3,150.00
Tubular 1×1 9 310 2,790.00
Marin Plywood 3/4 7 1050 7,350.00
ReBar 9mm 5 190 950.00
ReBar 10mm 2 220 440.00
Black Screw 1 1/2 200 1 200.00
Semento (Rizal Brand)2 2 200 400.00
Buhangin Sack 5 25 125.00
Welding Rod (Electrodes) e3018-3 80 240.00
PROJECT TOTAL COST 31,035.00

source

From:
Date: September 20, 2022

Please Share Our Content Or Will Steal Your Cookies

48 thoughts on “TUBULAR SECOND FLOOR I LOW BUDGET SECOND FLOOR I SECOND FLOOR NA GAWA SA TUBULAR AT MARINE PLYWOOD

  1. Sir may nakita akong isang video yung hagdanan nila bawat step nilagyan nila ng phenolic board pati sa second floor flooring bakit sayo wala kumukuha kasi ako ng idea sir baka kaawaan ng Dios may budget pampagawa ng second floor

  2. sir gandang araw po natuwa po aq s vlog nyo pwede ko po b malaman kung ano cp. no ng gumawa sainyo kc ho magppgawa din po aq ng bahay eh second floor din po 50sq. meters po mraming slmat po godbless po sau

Leave a Reply

Your email address will not be published. Required fields are marked *